Skip to the calculator
Concrete CalculatorYards, bags & weight

Gravel

Tons to Cubic Yards

Gravel is ordered in tons and placed in inches. The calculator connects those two units and adds extra for compaction.

Example area — replace it with the driveway, path, or base you are covering.

15%

Loose gravel packs down. Ordering about 10–20% more than the neat volume is a common way to finish at the depth you measured.

Quick answer

Tons to Cubic Yards: yards = L×W×D in feet ÷ 27. Tons = yards × tons-per-yard for the material. Crushed stone is often ~1.5 ton/yd³; pea gravel ~1.35; bank gravel / crushed concrete ~1.4. Add 10–20% when the stone will compact.

Tons to Cubic Yards: Tons are not yards

A ton of crushed stone is about 0.67 yd³ at 1.5 ton/yd³. Moisture and the quarry change the factor — confirm before you pay. “Tons to cubic yards” searches fail when people assume 1:1. The tons and cubic yards guide keeps concrete and gravel factors side by side.

MaterialTons per yd³ (typical)yd³ per ton
Pea gravel1.350.74
Bank gravel1.400.71
Crushed stone1.500.67
Crushed concrete1.400.71

Worked example with the tons to cubic yards

12 × 50 × 0.333 = 200 ft³ = 7.41 yd³ neat. At 1.5 ton/yd³ = 11.1 tons. With 15% extra ≈ 12.8 tons. Depth after compaction is less than loose depth — order the extra if the finished surface must stay at 4 inches.

Under slabs vs driveway stone

Base under a concrete driveway is often compacted crushed stone sized on this page, then the slab on the driveway calculator. Decorative pea gravel beds use the same volume math with a lower tons-per-yard factor.

Gravel driveway calculator — depth and compaction

A gravel driveway calculator is area × depth ÷ 27, then × tons-per-yard. Four inches of compacted stone is not four inches of loose stone dumped on grade — order 10–20% extra when the finished depth must remain after rolling.

Convert tons to cubic yards only with the material factor. Tons to yards calculator searches that assume 1:1 will short a crushed-stone delivery by about a third.

Under-slab base vs decorative gravel

Base under concrete is usually compacted crushed stone sized here, then the slab on a concrete calculator. Decorative pea gravel for beds uses a lower tons-per-yard factor and often a shallower depth. Pick the material preset before you trust the tonnage line.

Ordering stone without the 1:1 trap

How many yards in a ton of gravel? About two-thirds of a yard for crushed stone at 1.5 ton/yd³. Cubic yards to tons gravel runs the other way: yards × 1.5. Write the factor on the delivery ticket when you dispute a short load.

Driveway gravel calculator depths of 4–6 inches are common before a concrete slab; standalone gravel drives may use more. Compaction changes finished depth — order the extra percent when the finished surface must stay flush with a form or apron.

Related tools

Concrete driveway calculator for the slab on top · Tons guide for conversions.

Before you call the plant

Write the neat volume, the waste percent, and the rounded order on one line. Dispatchers prefer a single clear quantity over a story about how you measured the forms.

If a drawing sets thickness, cover, or mix strength, those details override any online default. This page is for planning quantity — not for designing the section.

Before you call the plant

Write the neat volume, the waste percent, and the rounded order on one line. Dispatchers prefer a single clear quantity over a story about how you measured the forms.

If a drawing sets thickness, cover, or mix strength, those details override any online default. This page is for planning quantity — not for designing the section.

Before you call the plant

Write the neat volume, the waste percent, and the rounded order on one line. Dispatchers prefer a single clear quantity over a story about how you measured the forms.

If a drawing sets thickness, cover, or mix strength, those details override any online default. This page is for planning quantity — not for designing the section.

Frequently asked questions

How many yards in a ton of gravel?

About 0.67 yd³ for crushed stone at 1.5 ton/yd³; ~0.74 for pea gravel at 1.35.

How much gravel for a driveway?

12×50×4 in ≈ 7.4 yd³ neat; ~12.8 tons crushed stone with 15% extra.

Why extra percent?

Loose stone packs down. Order more if you need the finished depth after compaction.

Tons to cubic yards formula?

Yards = tons ÷ (tons per yard for that material).