Skip to the calculator
Concrete CalculatorYards, bags & weight

Slabs and pads

Concrete Slab Calculator

Patios, shed pads, garage floors, and house slabs all start as a rectangle. Measure it once and read the order.

Your region

Feet, inches, cubic yards, and 40–80 lb bags

Concrete Calculator

Example measurements — replace them with yours.

Common sizes

10%

Most orders add 5–10% for spillage, uneven ground, and the last bit left in the chute.

Cost, truck size, and concrete weight

Leave a price blank to skip that estimate. Use the number your supplier quoted.

This job

Add each pour — slab, piers, steps — and Concrete Calculator totals them.

How to use a concrete slab calculator

A concrete slab calculator multiplies length × width × thickness after every side is in feet. Four inches is 0.333 feet. Six inches is 0.5 feet. Divide cubic feet by 27 for yards. Concrete Calculator does the unit conversion on each field so inches and feet can sit side by side — the failure mode that empties a truck early is multiplying 4 inches as if it were 4 feet.

Patios and walks often start at 4 inches on a compacted base. Driveways and garage floors are often 5 or 6 inches. Those are planning starts, not a design for soft fill or truck traffic. If a drawing sets the thickness, use that number. Soft soil, heated slabs, and bearing walls need a designed section before you trust any online default.

Odd shapes split into rectangles. An L-shaped pad is two pours on the job list. A thickened edge or trench footing is a second volume — use the footing calculator or monolithic slab calculator instead of guessing a single average thickness.

Worked example with the concrete slab calculator

12 × 12 × (4÷12) = 48 cubic feet = 1.78 cubic yards before waste. At 10% extra you have 1.96 yards. Ask most plants for 2.00 yards. Bag count at 80 lb: 48 ÷ 0.60 = 80 bags neat, 88 with 10% waste after rounding up.

Change thickness to 6 inches on the same pad and the neat volume jumps to 2.67 yards. Thickness is the expensive dimension once the area is large. A 20×30 slab at 4 inches is 7.41 yd³ neat; at 6 inches it is 11.11 yd³ — almost four extra yards for the same footprint. Re-run the Concrete Slab Calculator after thickness changes — depth moves yardage faster than length.

  • Area = 144 ft²
  • 4 in neat = 1.78 yd³ · with 10% = 1.96 yd³ · order 2.00 yd³
  • 6 in neat = 2.67 yd³ · with 10% = 2.93 yd³ · order 3.00 yd³
Thicknessft² per yd³10×10 yards (neat)20×30 yards (neat)
4 in811.237.41
5 in64.81.549.26
6 in541.8511.11
8 in40.52.4714.81

Thickness and coverage shortcuts

Coverage check: one yard covers 81 ft² at 4 inches and 54 ft² at 6 inches. Divide your area by that coverage for a quick yard estimate, then confirm with full dimensions. The slab thickness guide explains why patio defaults fail under cars.

If you already know the area in square feet, area × (thickness in feet) ÷ 27 still gets you yards. Concrete Calculator prefers length and width so you can keep the tape measurements you actually took. Split odd shapes into rectangles inside the concrete slab calculator, then sum once before waste.

Pad, garage, and house slab notes

A shed pad and a house slab share the same rectangle math. They do not share thickness, base prep, or vapor control. Concrete Calculator sizes the concrete you place; it does not choose the section. If the plan shows wire mesh or fiber, that does not change cubic yards — only weight a little if you bump density.

For a concrete pad calculator search, treat the pad like any slab: measure the formed outside, not the gravel pile. Outside corners and radius edges still sit inside a bounding rectangle for ordering; leftover concrete goes to a washout or a small leftover form you staged on purpose. Keep the concrete slab calculator nearby while you set waste so one volume drives bags and the plant ticket.

Common mistakes

The mistake that empties a truck early is multiplying inches by feet without converting.

  • Measuring the gravel high spot instead of the form height understates thickness.
  • Rounding every small pour up to a quarter yard, then adding them, over-orders. Add the job first, then round once.
  • Skipping waste on a rough base leaves a cold joint when the last corner goes dry.
  • Using a 4 inch patio default for a driveway slab understates volume by about a third versus 6 inches.

Bags, yards, or a truck?

Under about three-quarters of a yard, bags are usually the practical buy. Past a yard or two, price a truck including any short-load fee. Put both prices in the cost fields and compare on the same volume — see the ready-mix or bags guide.

One cubic yard of slab is 45 bags of 80 lb mix. A 12 × 12 × 4 in pad with waste is already in the high 80s for bags — a crew morning, or a short truck. Open the bag calculator if you want every bag size on one screen.

The formula Concrete Calculator uses

Cubic feet = L × W × T (feet). Yards = ft³ ÷ 27. Bags = ceil(ft³ ÷ bag yield). Weight = ft³ × density (default 150 lb/ft³).

The formula prints under the result so you can audit the order with a calculator on the hood of the truck.

Who this is for

Homeowners ordering a patio or shed pad.

Builders checking a garage slab before the plant call.

Anyone comparing bagged mix to ready-mix on the same rectangle.

Related calculators and guides

Open the pages that match the next question on the job — volume is only the first number.

  • Patio calculator for a walking slab
  • Driveway calculator when thickness goes to 5–6 inches
  • Bag calculator for 40/50/60/80 lb counts
  • Yard calculator for plant rounding
  • Slab thickness guide before you lock the depth

Frequently asked questions

How much concrete for a 10×10 slab at 4 inches?

1.23 yd³ neat (33.3 ft³). With 10% waste ≈ 1.36 yd³; order 1.50 from most plants. About 56–62 bags of 80 lb mix.

How thick should a concrete slab be?

Many patios and walks are 4 inches. Driveways are often 5–6 inches. Soft soil, vehicles, and bearing walls need a designed thickness.

How many bags for a 10×10 slab?

At 4 inches, 56 bags of 80 lb before waste (33.3 ÷ 0.60, rounded up). Add waste before you buy.

How much for a 20×30 slab?

At 4 inches: 7.41 yd³ neat. At 6 inches: 11.11 yd³ neat. Add waste, then round to 0.25 yd.

Does this include footings?

No. Add a footing pour on the footing calculator, then use Add this pour so the job total combines.

Can I enter metres?

Yes. Each field has its own unit, or open the metric calculator for a metre-first layout.